塑膠地板施工前需要做哪些檢測?
來源:http://www.hghreleaserreview.com 日期:2019-02-16 發布人:admin
PVC塑膠地板在施工之前需要對地面狀況進行檢測和項目標準評估,主要要做好下面這幾個方面:
Before the construction of PVC plastic floor, it is necessary to inspect the ground condition and evaluate the project standard. The following aspects should be done well:
1)強度
1) strength
細石砼找平層(或水泥砂漿)強度等級大于C20,用硬度測試儀檢測結果應是地坪表面硬度不低于1.2兆帕。細石砼找平層(或水泥砂漿)不得空鼓、裂縫、起砂。
The strength grade of fine stone concrete leveling layer (or cement mortar) is greater than C20. The hardness test result by hardness tester should be that the surface hardness of the floor is not less than 1.2 MPa. Fine stone concrete leveling layer (or cement mortar) shall not be empty, cracked, sand.
2)地面平整度
2) Ground smoothness
2m范圍內高低誤差在3mm內(2m長檢測尺檢測)。
The high and low errors within 2m range are within 3mm (2m long measuring ruler detection).
3)干燥度
3) dryness
施工前應確保地面干燥,砼或水泥砂漿找平層至少超過終凝養護期28天,使用CNN含水率測試儀檢測基層的含水率應小于3%。
Before construction, the ground should be dry. The leveling layer of concrete or cement mortar should exceed the final curing period for at least 28 days. The moisture content of the base should be less than 3% by using CNN moisture tester.
4)防水
4) waterproof
衛生間、洗涮間、開水間等可能長期接觸水的部位,墻地面應做好防水層(防水層上墻高度不低于30cm)。衛生間、洗涮間、開水間等地面標高應低于其它部位地面標高3-5cm。
Waterproof layer should be made on the wall and floor (the height of the wall on the waterproof layer is not less than 30 cm) where the toilet, washing room and boiling water room may be in contact with water for a long time. The ground elevation of toilet, washing room and boiling water room should be 3-5 cm lower than that of other parts.


底層樓面地坪,土建方(或裝飾方)應做好防潮層。
On the ground floor of the first floor, the civil engineer (or decorative engineer) should do a good job of damp-proof layer.
5)與其它材料交界處的高差
5) Height difference at the interface with other materials
其它地面材料交界處(地毯、大理石、木地板、地磚等)高差應在負4-6mm之內。亞麻油地材鋪設前門扇底至地面留縫H≥10mm。
The height difference at the junction of other floor materials (carpet, marble, wood floor, floor tile, etc.) should be within minus 4-6 mm. Flax oil floor material laying front door fan bottom to ground seam H (> 10mm).
6)交叉施工
6) Cross construction
地材施工禁止交叉施工。地材進場施工,應安排在所有前期工序均已完工退場后進行或后涂裝前進行。
Cross construction is forbidden in floor material construction. Ground material entry construction shall be arranged after all the pre-process has been completed and exited, or before the final painting.
7)施工工期
7) Construction period
地材施工,每道工序都有一定的養護期,且后期施工較精細。為保證施工質量,必須保證足夠施工工期。
Ground material construction, each process has a certain period of maintenance, and later construction is more elaborate. In order to ensure the construction quality, it is necessary to ensure sufficient construction period.
以上內容由森然塑膠地板廠家整理發布,更多詳細內容可以點擊我們的官網進行咨詢:http://www.hghreleaserreview.com/
The above contents are arranged and published by Moran Plastic Flooring Factory. For more details, please click on our official website to consult: http://www.hghreleaserreview.com./
相關新聞:
- 塑膠地板的夏季維護保養事項! 2021-07-15
- 塑膠地板廠家講述地板保養護理方法? 2021-07-13
- 塑膠地板廠家怎么進行地板護理? 2021-07-08
- 處理塑膠地板劃傷的方法是什么? 2021-07-06
- PVC地板劃痕修復你會嗎? 2021-07-01
- 淺談塑料地板保養和去除異味的方法! 2021-06-29
- 為什么運動場都用塑膠地板呢? 2021-06-24
- 淺析塑膠地板迅速普及的原因! 2021-06-22
- 塑膠地板打蠟需要留意哪些方面? 2021-06-16
- 塑膠地板能解決哪八大問題? 2021-06-11